Santa Ana River Mainstem Project
The Santa Ana River Mainstem Project consists of seven major features including the construction of 550 ft. high earth and rockf ill dam; raising the embankment by 28 feet of Prado Dam,...

Design Alternatives for Protection of the Santa Ana River Interceptor Sewer
The Santa Ana River Interceptor Sewer (SARIS) line buried within the floodplain of the Santa Aria River is being threatened by long term degradation of the river bed at the pipeline crossings,...

European Progress on river Renaturalisation
Most restoration projects in Europe have been designed to maximise species richness with little regard for channel stability. To recreate a sustainable natural channel it is necessary...

Role of Vegetation in Hydraulics of Channel Restoration
Boundary layer theory is used to develop a backwater model for flows through vegetated waterways which can be employed to approximately estimate flow depth variation in channel restoration...

Maryland SHA's Procedure for Assessing Existing Bridges for Scour Vulnerability and for Rating Unknown Foundations
The Maryland State Highway Administration developed a recommended screening procedure for rating existing bridges for Item 113, Scour Critical Bridges, in the National Bridge Inventory...

Economic Risk Analysis as a Research Directing Paradigm
Risk analysis could be used to direct a manageable, prioritized strategic plan for evaluating bridge scour research needs. Through risk analysis, the costs of research and the potential...

Utilizing Geomorphic Analogs for Design of Natural Stream Channels
Engineering guidelines for the design of stable rock armored channels are well established. However, few guidelines exist for designers involved with the reconstruction of channels with...

Reduction of Sediment Loads in DEC Streams
The U.S. Army Corps of Engineers, Demonstration Erosion Control (DEC) project is actively involved in the stabilization and restoration of many drastically disturbed incising streams in...

Scour-Hole Dimensions at Selected Bridge Piers in New York
Knowledge of scour-hole dimensions can be used by bridge engineers to deter mine the extent of countermeasures needed to prevent scour at bridge piers. Scour-hole widths at 128 piers,...

Design Guidance?Instream and Bank Restoration Structures
Despite an urgent need for river and stream restoration design criteria, little guidance has emerged in recent years. Existing guidance is largely unsatisfactory, promoting empiricism...

Design Guidelines for Bioengineered Bank Stabilization
Design of bioengineered slope stabilization measures in riverine environments to minimize rates of stream bank erosion requires accounting for hydrologic, hydraulic, geomorphic, geotechnical,...

River Restoration Considerations Beyond Channel Design
Restoration of river systems in highly disturbed environments poses unique challenges beyond channel design. The Jordan Creek Restoration project in Idaho was conducted in a valley disturbed...

Channel Scour Protection at Roadway Crossings
There are several forms of channel scour which may damage a bridge or culvert crossing over a natural or improved channel. Typical forms of scour include general degradation, local scour...

Use of Geomorphic Data for Assessing Stream Stability at Bridge Structures
The authors recently completed a statewide bridge scour evaluation for the Nevada Department of Transportation, which included evaluation of the geomorphic processes of bank erosion and...

Stream Instability in Loess Base Channels
The incision of bess base stream channels is a common and destructive response to alterations within a watershed in the midwest. Monitoring and evaluating procedures are being performed...

Channel Restoration Project along Toby Creek
Creek banks within Mecklenburg County, NC, are eroding, producing excessive quantities of sediment in the creek and causing bank instability. Seeking innovative approaches to these problems,...

South Platte River Restoration through Maintenance
This paper describes the use of restorative maintenance activities by the Urban Drainage and Flood Control District to clean up, stabilize and restore river banks and grade along the South...

Tributary No. 9 Restoration, Maryland State Highway Administration
The Maryland State Highway Administration agreed to accomplish restoration of 1,100 feet of stream channel as part of a mitigation agreement with the U.S. Army Corps of Engineers, Baltimore...

Third Party Impacts of Proposed Water Banking in the Colorado River Basin
Colorado River water is allocated to the seven Basin states based on a set of legal entitlements. Little flexibility is explicitly granted for addressing water shortages to particular...

Bank Protection Toe-Downs and Local Pier Scour
The zone-of-influence for pier scour may impact bank protection toe-down depths. Countermeasures were required at a site along the Salt River in Phoenix, Arizona when the alignment of...

 

 

 

 

Return to search